You need to unblock this content by setting your broser.
ブラウザーはこの内容をブロックしないように設定してください。

INFO:
ERCOT entered level 1 and level 2 Emergency Operations on September, 6 to maintain stability of the grid. The EEA 2 was issued due to a combination of dropping operating reserves and frequency.
ERCOT returns to normal operations, but high temperatures continue | GridBeyond